Skip to main content
Integride Solutions, home

Impact & ESG

Impact we can show, and impact we are only aiming for

Integride organises its impact reporting around three pillars. Every figure carries a label so a target is never mistaken for a result.

How we label evidence

Four levels, so you always know what you are looking at

No environmental, economic or social performance figure appears on this site without one of these labels. We do not publish impact data we cannot evidence.

  • Verified

    Measured result

    A figure measured from operations and supported by evidence we can show. None are published yet.

  • Target

    Company target

    A goal or design specification. It states where we are aiming, never what has been achieved.

  • Modelled estimate

    Modelled estimate

    The output of a stated model using stated assumptions, such as the fleet estimator.

  • Illustrative scenario

    Illustrative scenario

    A worked example that shows how a figure is built. It is not a forecast and not a result.

Triple bottom line

Environmental, economic and social

Environmental

Tailpipe emissions eliminated and petrol and diesel displaced by electrified commercial transport.

What we track

  • Emissions avoided
  • Petrol and diesel displacement
  • Energy efficiency
  • Sustainable transport

Where it stands

  • CO₂ abatementTBCPending verification
  • Kilometres electrifiedTBCPending verification
  • Petrol and diesel displacedTBCPending verification

Measured from fleet telematics (distance and energy use) with published emission factors, once vehicles are operating.

Economic

Lower operating costs and higher productivity for the operators who run commercial fleets.

What we track

  • Fleet operating-cost optimisation
  • Driver income improvement
  • Commercial productivity
  • Lower operating expenses

Where it stands

  • Reduction in fuelling and maintenance overhead30–40%Target
  • Fleet uptime98%+Target
  • Battery swap timeUnder 2 minutesTarget

Measured from operator cost data and telematics during trials and deployments, not assumed.

Social

Technical employment and vocational certification, especially for young people and technicians.

What we track

  • Technical employment
  • Youth development
  • Workforce certification
  • Local technical capacity

Where it stands

  • Certified workforce traineesTBCPending verification
  • Green-collar technical jobs createdTBCPending verification

Measured from confirmed certification and employment records.

Worked example

How an impact figure is built

There is no measured Integride operating data to chart yet. To show the method instead, this is a worked scenario using the same engine as the fleet estimator.

Illustrative scenario

Illustrative scenario · 50 electric two-wheelers

Petrol displaced per year
35,100 L
CO₂ abated per year
55.8 t
Operating cost
42.2% lower

Annual operating-cost difference in this scenario: $40,014 (AUD, planning rate, not live). Default AUD assumptions; operating cost only, not total cost of ownership. Methodology.

Evidence register

Every impact figure on this site, and its status

If a number is not in this table, it is not an Integride impact claim. As evidence is supplied, rows are promoted to measured results.

Impact figures, their value, status and basis
FigurePillarValueStatusBasis
CO₂ abatementenvironmentalTBCPending verificationCompany target (tonnes and period) has not been supplied. It will be reported from fleet telematics once operations produce verified data.
Kilometres electrifiedenvironmentalTBCPending verificationTo be reported from telematics once vehicles are operating. Nothing is reported yet.
Petrol and diesel displacedenvironmentalTBCPending verificationDerived from verified distance and the fuel consumption of the vehicles replaced. Not yet available.
Reduction in fuelling and maintenance overheadeconomic30–40%TargetAim stated in the brief. Not yet evidenced by operating data. The estimator derives savings from physical inputs rather than assuming this range.
Fleet uptimeeconomic98%+TargetOperating target. It is not an achieved result.
Battery swap timeeconomicUnder 2 minutesTargetProposed operating specification for the swap stations. A design target, not a measured company-wide result.
Certified workforce traineessocialTBCPending verificationTo be reported from confirmed certification records. None are reported yet.
Green-collar technical jobs createdsocialTBCPending verificationTo be reported from verified employment records. None are reported yet.

Reporting approach

Evidence first, then the claim

Impact will be reported from the same data that runs operations: telematics for distance and energy, certification records for training, and operator cost data for economics.

  • Figures are published only with a status label and a stated basis.
  • Methods and assumptions are documented and open to challenge.
  • Where a result is modelled, the model and its assumptions are shown.

Funding or measuring green mobility? Let us talk.

We are glad to share how our impact reporting is designed and what evidence will be available, and when.